Kv Tellus

Vallentuna gymnasium is undergoing a renovation where the premises will also house the new municipal building. The high school building currently has capacity for 650 people, which has so far not been used by the current student population of about 400 students. At the same time, the municipality was in need of new premises, which resulted in a merger.

The building will be renovated with a new fan room on the roof and a parking garage.

On behalf of Arcona, Exengo carries out the design of all installation systems during system documentation and construction documentation in close cooperation with the installers.

Client

Property owners

Year of assignment

2022-2023

Location

Vallentuna, Stockholm

Surface area

9 000 sqm

Visualization